I be very surprise if Openreach survey gonna cost u a bomb bill of more than £2,000 to cancel the order. Your probably end up Band C or D instead of B.
I think that�s what they are going to confirm. The aggregation node is close, however duct work etc... needs to be confirmed. I have a pole right outside my house, so I am guessing that�s probably the path it will take.
so u took first order from cerberus 8th September, openreach doing survey on the 25th September. Look like they speedy it up with your order to get FTTPoD activation date around December before xmas day!
The default time is 60/90 days to install, so yeah it could be December, but I was told this by them up front. They said the fastest they think it could be done is 60 days, but it all comes down to the survey.
Snake
adslmax (knowledge is power)
Wed 20-Sep-17 22:42:51
Wish u all the best of luck. Remember post back each photos of the work by openreach, modem, router and post back speedtest (morning, afternoon and evening.
Same here, actively following as I'm tempted by Cerberus's FTTP on demand offer, I believe there's ducting under my house as there was a piece of string there ready for Openreach to install the cable when we moved in around 6 years ago, waiting to see how it goes on here before ordering myself.
adslmax (knowledge is power)
Thu 21-Sep-17 10:43:13
Because they can't pull cable through the ground with string. There must be ducting if they were pulling cables with string.
Sounds like a new property.
adslmax (knowledge is power)
Thu 21-Sep-17 11:26:52