Again, yes but... I'm moving soon and my original question was an attempt to compare the potential speeds at my new location with what I have now then work out what my 'real' speed could end up at. The BT checker suggest in 76.4 to 55.8 down on a clean line. My thinking was that's lower than I have now so I'll end up with around 50 to 55 or so.
Once the choice of "clean" or "impacted" has been made (and it is a choice you can make), then the range of speeds applies as follows:
- You can end up anywhere within the range, or above it, or below it.
- The range is calculated from the performance of "similar lines"
- 20% of subscribers on "similar lines" go faster than the top of the range
- 20% go slower than the bottom of the range
- 60% are between the two figures.
- If you are in the bottom 10%, then Openreach will send an engineer to investigate.
- Barring a real fault, the main driver of where *you* will be is crosstalk
- Crosstalk is caused by other subscribers; it is random; you cannot affect it
The clean/impacted decision - it isn't about how the line is actually behaving. It is, instead, about whether the line is trusted to behave well... and that "trust" is gained by sending an engineer to install things.
Note that clean/impacted never existed in the checker at first. It only came into being when BT introduced self-install. The thinking at the time was that engineer-installations got a "clean" speed quote, while self-installed lines got a lower speed quote. The aim was to stop BT engineers being called out to someone who didn't pay for a "proper" installation.
Nowadays things aren't so clear, as ISPs have muddled their product offerings around over time.
So ... how do you *choose* clean or impacted? Simple: pick an ISP that quotes you the "clean" range in preference to an ISP that quotes you the "impacted" range or an ISP that quotes the combined range (as examples, Plusnet do the first; TalkTalk do the second; AAISP do the third).
If you want the best potential speed (and not just a contract term to argue with the call centre over), choose an engineer installation.



Pages in this thread:
Print Thread
