That's all correct. What you see is the power piller that has the 230v LV power feed. The DSLAM is in a white hardened enclosure and located underground . There is a multi pair copper cable connecting to the power pillar . Also Underground will be the hybrid enclosure connecting the fibre to the DSLAM the copper terminations which will make up the new 'PCP'
Which makes me think the DSLAM isn't going to be very big?
In which case why not just make the cab slightly larger and house the DSLAM inside the cabinet? surely it would make it much easier to work on instead of being in a pavement chamber?



Pages in this thread:
Print Thread
connormill