Openreach have just scheduled duct clearing work for spine cabling works for around 10 days in my and the surrounding roads (most of which are cul-de-sacs). As per the attached it refers to two PON numbers and PCP11. Now I'm not served by PCP11 and neither are the majority of roads on which the works are scheduled, which instead are served from PCP12 (& we already have FTTC, I get around 60Mbps). PCP11 appears to serve the business park and they don't yet have fibre.
With my pessimistic hat on, I expect therefore the work is to provide fibre to the business park and in reality they won't need to come into the majority of these roads (PCPs 11 and 12 are located next to each other, with PCP 11s VDSL2 cabinet, in the entrance to the business park).
Do you think there any glimmer of hope to get excited that they may have decided to roll out FTTP to the entire neighbourhood served by both PCPs 11 and 12, or more likely a mistake/precaution of scheduling works all the way around the whole area served by the cabs? I've just not seen such a scale of duct cleaning scheduled before, it's normally along a route from exchange to cab.
The areas served by PCP12 are 1990s new-builds with underground ducts to each property.
Roadworks.org map:
https://fibre.everestpark.org.uk/wp-content/uploads/...
Sample works detail:
https://fibre.everestpark.org.uk/wp-content/uploads/...