We are about 350m from this pole (as the cable goes, not as the crow flies). There was also a photo of the planned layout-
https://photos.app.goo.gl/bQDHzHPYwRjxYVyx5
The openreach website says similar to the digital scotland website -
Your area is currently in our plans to be upgraded with Fibre to the Premises (FTTP), however we follow a different design and build process for FTTP so you won't see updates at each stage. Once the engineering work is completed there is a commissioning period of up to eight weeks before an order can be placed. When you are able to place an order you will see the Accepting Orders message.
and the BT checker says (apologies for the lack of formatting - best i can do with cut and paste as i dont know what you are looking for!)-
ADSL Products Downstream Line Rate(Mbps) Upstream Line Rate(Mbps) Downstream Range(Mbps) Availability Date Left in Jumper
WBC ADSL 2+ Up to 1 -- 1 to 3.5 Available -- --
WBC ADSL 2+ Annex M Up to 1 Up to 0.5 1 to 3.5 Available -- --
ADSL Max Up to 1 -- 0.75 to 2.5 Available -- --
WBC Fixed Rate 0.5 -- -- Available -- --
Fixed Rate 0.5 -- -- Available -- --
Other Offerings
Availability Date
ADSL Multicast -- -- -- Available -- --
Premise environment
Status
Bridge Tap U
VRI N
NTEFaceplate N
Last Test Date 05-06-2018