To be honest I had forgotten about the exception part of all this (despite the title of the thread) as it was so long ago! It took 5-6 weeks to get it sorted and resulted in a new manual order. When I sent my email I only really relayed the problems with the stuff after the order went through.
Well as far as I am aware (I am sure I will be corrected if I am wrong) anytime there is an issue a Exception TAG is put in place and the issue needs to be resolved before they will remove it and continue on until they get another issue where another TAG get added and so on.
What do you mean by go either way?
I mean, if there is too much of an issue getting it resolved they "might" say its no longer viable to be done.
They did the same down the bottom part of my road an the bottom side roads, where they installed all the FTTP hardware (which is all still there by the way) many years ago, but just didn't flick the switch, and last year they were given FTTC.
And when I asked I was told it was no longer viable to do so due to the cost of engineers (2 stage install) and the average package the people was asking for.
I can see their point, but at the same time surely fibre has a less maintenance cost than copper well for our area it should be due to engineers are always in my area working on the copper lines.
Paul
BTBroadband - Ultrafast 2 + FVA
Exchange Name: Ilford Central (LNILC) Cabinet: 24
TBB Speedtest IPv4 | TBB Speedtest IPv6 | Ookla Speedtest | Linksys WRT 3200 ACM (BQM)
Exchange Name: Ilford Central (LNILC) Cabinet: 24
TBB Speedtest IPv4 | TBB Speedtest IPv6 | Ookla Speedtest | Linksys WRT 3200 ACM (BQM)