That is a governance issue; basically wasting shareholder money
Counter-arguments:
1. If a team of fibre engineers can FTTP-enable 40 village homes, but in the same amount of time they could FTTP-enable 80 densely-packed urban homes, which should Openreach do?
2. The cost of activating rural connections is higher. Let's suppose that 20 of those village homes decide to connect to FTTP. That involves sending out the FTTP installation team, on 20 separate days, back to the same remote village (to drill through walls and make the actual fibre connections). It would likely be cheaper to activate 20 city dwellers, where the teams are already nearby. It's also a consideration for putting in an FTTC cabinet instead.
3. By not putting in FTTP off their own bat, there's a chance they will get a subsidy to do it later.
4. By deciding to spend time working on the village project (which wasn't previously planned), they will delay the already-planned rollouts in other locations.
I'm not saying that there isn't an opportunity to do parallel rollout of FTTP when new-builds get FTTP or FTTPoD is deployed. I'm just saying the business case for doing so is not as clear-cut as you make out.