Initially I thought dect was agreeing with me (edit-seems so) but the post from Bazzaar made me unsure!
Anyway moving on, I’m not convinced the argument could be made that it’s cheaper long terms to bury that last section fibre from connectorised DP to the house. I remember in the training for it we had normal Openreach overhead copper cable and the new overhead connectorised hybrid copper/fibre cable. I was whacking it with a hammer and twisting it in all sorts of ways and simply could not change the amount of light getting through the fibre part of the new cable. It’s very high quality stuff.
That’s anecdotal mind, I could well be wrong.
Edited by deleted (Wed 17-Jun-20 09:51:29)