-I originally ordered FTTP with BT (without a landline) on the 11th December 2020 with an install date of 25th January 2021.
-On the 18th Jan 2021 I rang in and BT said the order had been cancelled by their systems due to a problem on the "backend" and that they couldn't fix it after trying for 2 weeks, but regardless Covid-19 restrictions meant that it wouldn't be going ahead anyway.
-I got a call from a manager at BT on the same day and the outcome was that I would not be joining BT as a customer and everything was cancelled down (I didn't trust that they could actually solve the issue and had lost confidence).
-I successfully signed up with Zen the same day as the BT order was cancelled and was given an installation date for today (29th March - PM slot).
-At 4.30 PM today no Openreach engineer had arrived so I phoned Zen.
-Zen said that the job was live but hadn't been allocated to an engineer but said they can't chase until tomorrow as the engineer might turn up before 6pm and work late.
It's now 6 PM and no engineer has turned up and I've had no contact from Openreach at all. I've just wasted a day of holiday waiting for them to turn up and I just think it's so rude not to bother letting people know. How hard can it be to get FTTP installed and why are Openreach so utterly incompetent?
What happens now? Presumably Zen has to chase them tomorrow to find out what happened but any idea how long it will be before I get another engineer appointment?