I'm not really sure what to do.
After re-checking the Hampshire broadband site today, I've now been informed by that site that the address is under 24mbits (which i know) and that they basically ran out of money.
I've been told via openreach, they have shifted completion date to July 2022(from pushed back date of dec 2021), The exchange (Bransgore) is on the May openreach fibre rollout.
Hampshire county originally told me that they were gonna fttp the 5 postcodes back in 2017. I was even given the fttp v code.
To date
around 2017 single ream of fibre cable on pole with new jf box by the pole. - was told it was for fibre.
2018/19 work to clear road ditches and ducting.
2020 April Most of the post codes now have cbts and overhead cabling done.
2021 April adjacent road had roadworks to clear ducting issue to bring fibre cable to end of the street.
As you can see the work has been frustratingly slow. I do appreciate the new forest has its own unique set of issues.
I'm at the end of my ISP contract this year hence the extra frustration - freeola with their 1 month contract is an option.
Would the csp route frustrate things ?
note: I can't get wireless because of the house being lower than the road on one side. So its either satellite or dsl/fibre