Thats what I have been after ...
Reading briefly, they will dig a trench - which is fine although it may be 60m of gravel and soil with NO obstructions such as walls. The 3m I had been told about is actually 5m - that will make it reasonable too. It should give two options - a bedroom where teh current hub is located or a garage..
3m would me - no first floo, but 5m makes it possible.
Be interested to know if they'll dig and duct the 60m from pot to house or if they simply spade-in a blown fibre tube direct in ground and leave it at that.



Pages in this thread:
Print Thread
