I think it can be any where between weeks and months just depending on whether everything upstream is already in place. Even once a fibre is visibly installed it doesn't mean that all of the other work back to the exchange has already been completed.
One of the larger estates here had openreach fibre a while here, again I think they are following zzoomm and one road for some reason have had openreach Full fibre for a few years. i thought it was strange that it was just one road, but knowing now that FTTP branch off the same fibre for FTTC, I suppose it was not a big thing to do.
Still strange.
What is a bit strange is I went for a walk today to Lidls and noticed down a road where half of it is Zzoomm and Openreach and the other half is Zzoomm only. I also noticed that the four roads I walked down, only 3 houses had Fibre and those three houses are here by me in my road, two Zzoomm and one Openreach. I normally cycle or go by car, so I don't get to look at things, but as I walked today I thought I would have a nose. Maybe more will change as the year goes on.
I also noticed a pole on the way back that is a bit iffy, I would not like to climb on it, It was like the Leaning Tower of Pisa, and it has 4 CBTs on, as it is close to flats and bungalows.
Well, now that the holidays are over and people are getting back to some normality, not that it was any different for me as I worked my normal days, maybe more people will order.
Adrian
Desktop machine Ryzen powered with windows something or other.
Plusnet FTTC