For the 8th time, work programmed on one.network and bidb.uk for doing something with dangling fibre cables on 2 telephone poles in the village with CBTs fitted has been changed to a different date. There has been no work done at all on them in ages, not seen an OR van nearby in months.
The housing area and the village each side of us on the same exchange have FTTP service and bidb.uk shows multiple FTTP installations active in each.
What do we have to do to get that last duck in the row?
--
Brian
UW (Talktalk via openreach FTTC) - 80/20 sync
Brian
UW (Talktalk via openreach FTTC) - 80/20 sync



Pages in this thread:
Print Thread
rippedcotton