Whe you say passed, did Gigaclear provide a Pot on the edge of your property?
Excellent question. I was wary of hijacking the OP's post but they passed us without placing a pot. They dug up the road and laid a pot outside every cottage until about four or so houses before ours, stopping about 100 metres away. They then dug up the road and installed a manhole right next to an existing OpenReach manhole. And then literally passed a bunch of houses before digging another trench between two OpenReach poles, installing a Gigaclear manhole at the base of each.
I'm a regular runner and so have observed their work pretty much everywhere else in the area and we're the only stretch of road I've found so far that didn't have pots installed.
Given what they did do, my assumption is that they plan to piggyback on the existing OpenReach ducts and poles (PIA??). But, if so, I have no idea why they decided to only do this for the bunch of cottages near us and nowhere else.
Of note, I randomly entered post codes for houses they installed pots for, and they were pretty much available to order within days of being passed. Whereas we were 'passed' months ago and still no ability to order.
It's all very odd... and hence my question to the OP about whether they were told they could order or if, like us, they still appears as 'we're on the way'.
At further risk of hijacking the thread, I'd love to find a way to figure out what Gigaclear are actually planning - the chat service and call centre know nothing.