I've only ever had subcontractors work on my copper line, except when I've filed a fault, when it has always been Openreach engineers that have turned up. I suspect the same will happen with the fiber install.
On a side note: I'm guessing they will not touch the copper when they come to do the fibre? There's no PSTN on the line anymore - it's actually been disconnected now - the line only has VDSL2 on it. Once fibre is installed to the property, there should be no need to ever revert back to copper - right? I'm thinking about disconnecting the copper at the wee junction box where the black drop wire connects to the internal cable, so I can remove all the internal cabling, as it is tacked onto the skirting / architrave so doesn't look great. The fibre will (almost certainly) be entering the flat in the same room, but I'm going to get them to terminate it there too, and build a wee cabinet for my OPNsense router and a server I'm building.
Edited by andrum99 (Thu 05-Jun-25 18:50:55)