A quick update. The "committed date" was supposed to be tomorrow (Thursday 24th) but as expected, my ISP called me yesterday to say Openreach need to send out a surveyor and this will take longer, so the appointment for Thursday was cancelled until they can figure out it's all doable.
Out of the blue, this morning, an Openreach engineer called me to say he is on site and looking to do the external work. I popped round and they have a cherry picker and two engineers, and were looking to get the drop wire to the site office from the pole.
I mounted a strong piece of timber to the side of the cabin to get a little extra height and more secure than mounting on the fascia, and they used this with the triangle mount for the drop wire. As there was a tree that the wire had to go through from the pole, they also managed to get some extra height when passing it through by using a tree branch so when it came out the other side it was a few feet higher than the pole itself.
It's plenty high enough and out of harms way of anyone. A few photos:
https://photos.app.goo.gl/Jzq1FGSbdRA4pnJk6
https://photos.app.goo.gl/bAKYFCZn4RMiqqyAA
https://photos.app.goo.gl/qz2z8EJG3DBDMsQY9
They have completed the external works and we now await another engineer to patch it through and install the ONT (something they were not able to do apparently, as they were just there to prove it can be delivered).