Much of that time from LAs is probably in order to try and reduce the number of different utilities visiting the same place in a short time. There are ways they could possibly be more pragmatic about things but that can be difficult when you are working on a large scale and everyone wants to be an exception.
And if you thinks LAs are bad try getting a line installed that crosses church land. That can take forever to get permissions sorted out.
And finally, I worked for a local authority installing broadband access in schools. It was no easier for the authority to arrange way leaves with either itself or with church owned land that it is for anyone else. There were no back doors to speed up the process.