ali corrodes awful. copper doesnt - just bad joints. on the very best ali joints i have noticed the insulation peels off very easily, also ali doesnt like being bent as much. Once an ali joint gets wet it is finished, unless there is enough slack to cut back 60cm (rare) and the engineer is allocated enough time to repair (never), then a simple recrimp will result in unintentional hr dis faults, with almost every subsequent repair or interventiin in the joint knocking other lines off.
performace wise over 3km of line on my local cab a change from 100% ali run to 60% ali run gives an extra 2meg on adsl 2.
the rule of thumb when taking measurements on ali was to add 20% onto the result - i.e. a line measures 100M for copper line tester is actually only 80M long if made of ali.



Pages in this thread:
Print Thread
deleted