Placing the order is actually what they are meant to do. Then it goes to Openreach who will see if a copper pair to the exchange is available and will move the phone line onto that and let the ADSL order progress, or if non-available will fail the order.
Kingswell has copper overlay, but not enough for every line on the TPON.
Fujitsu did a trial running a small DSLAM alongside the TPON hardware, but cost wise possibily not worth it, but with BDUK things may change.



Pages in this thread:
Print Thread
