I'm finally ordering FTTC next week, I've previously posted about how BTO think my line goes to PCP23, when it actually goes to PCP15.
Is the connection made live on the fibre cabinet prior to the engineer attending to jumper across? i.e. If an engineer turns up, I tell him it's the wrong cabinet, can he do anything about it on the day? I'm hoping it's not a Kellys engineer, but I presume most installs are nowadays. Can he simply make a call to get the a pair on the fibre cab for PCP15 made live?
Cheers
Lee



Print Thread
vit0