Hi,
I'm currently in the limbo period of waiting for Fibre Broadband in my area through Openreach, or rather 'Connection Stage' on their website, with the generic 'usually available within 4 months' wording.
I've read through several online forums, with accounts ranging from 6 months plus, mostly due to power supply issues or failures, through to people seeing the new cabinet go in and fibre broadband be available within 2 weeks. FNS were installing the equipment this week, so guessing it's now down to power connection, linking to the existing cabinet and testing.
After searching for more details on tracking work on cabinets, I came across the Telecom Tariffs CodeLook website, which gave details of my local cabinet from my postcode, listed what other cabinets are being installed at the same time and estimated live date, which has my area is October.
Without getting my hopes up and a speedy activation, does anyone know how accurate this site is and where they get their data from?
https://www.telecom-tariffs.co.uk/codelook.htm?xid=8...
Cheers



Print Thread