General Discussion
  >> General Broadband Chatter


Register (or login) on our website and you will not see this ad.


Pages in this thread: 1 | [2] | (show all)   Print Thread
Standard User kebabselector
(committed) Sat 16-Feb-19 14:37:24
Print Post

Re: Clearing Blockages


[re: deleted] [link to this post]
 
Thanks for the info.

Zen: 77mb down - 20mb up
Stechford (CMSTE) Cab 50
Standard User witchunt
(experienced) Sat 16-Feb-19 17:27:48
Print Post

Re: Clearing Blockages


[re: deleted] [link to this post]
 
Appears to be low drop wire. Lots of poles will be tested prior to overhead fibre being installed.
Standard User kebabselector
(committed) Mon 18-Feb-19 09:52:05
Print Post

Re: Clearing Blockages


[re: witchunt] [link to this post]
 
Thank you

Zen: 77mb down - 20mb up
Stechford (CMSTE) Cab 50


Register (or login) on our website and you will not see this ad.

Standard User max360
(regular) Mon 18-Feb-19 12:20:06
Print Post

Re: Clearing Blockages


[re: kebabselector] [link to this post]
 
In my area. The FTTP (survey/duct clearing) work started in July 2018. The FTTP become available to order on the 25th of December 2018.

I had it installed on the 25th of January 2019. So It shouldn't be too long, before it's available.

ISP: BT - FTTP 330Mb/50Mb
ISP: PlusNet - FTTC - 80Mb/20Mb

Birmingham Fibre First Program: FTTP - BT Ultra fast fibre 2 plus package - 330Mb down 50Mb up.

Stechford (CMSTE) Cab 24 - Funded Privately (Community Partnership).
Standard User kebabselector
(committed) Mon 18-Feb-19 16:16:21
Print Post

Re: Clearing Blockages


[re: max360] [link to this post]
 
Good to know, as I mentioned earlier I'm really surprised it might be coming considering how the area wasn't economically viable for years.

Zen: 77mb down - 20mb up
Stechford (CMSTE) Cab 50

Edited by kebabselector (Mon 18-Feb-19 16:17:11)

Pages in this thread: 1 | [2] | (show all)   Print Thread

Jump to