Posted that VM were due to do works in our area in the VM thread but realised this is probably best place for it. Cant delete my other post
Anyway VM have been doing works in our village all week. Each street the works are scheduled for a few days. They came to our street Tues and finished works Weds.
Its a fairly long street with 30 houses on each side. According to a neighbour they dug 1 hole quite deep down, installed a manhole cover and filed it back in. I assume this is for cable access once the installation works begin?
Anyone that has similar how long after did VM installed the cables?



Print Thread
bobble_bob