Hi peeps, I just wondered if anyone else has had a long delay from having their FTTP hooked up by BT? Within 8 days of my noticing my cabinet was taking orders the engineers had blown the fibre and installed the wall box. I was given the install date for the internal wiring (and don't laugh) as 1st April. Long and short is that I am still waiting, with the latest promise of the 23rd May for the install. Apparently there was a kink in the outside wiring causing an issue and the "special" engineer required to troubleshoot this type of problem are apparently as rare and hens teeth. Is this an average time delay for this type of work? Do you think if I complain loudly I may get a month free or something? Please tell me your thoughts.