User comments on ISPs
  >> PlusNet plc


Register (or login) on our website and you will not see this ad.


These posts have been archived and can no longer be replied to or modified.
Pages in this thread: 1 | 2 | (show all)   Print Thread
Standard User deleted
(deleted) Mon 11-Jan-10 17:21:56
Print Post

High ms on Pro package.


[link to this post]
 
Hi,

I've been having issues for the past 2 weeks or so, I purely use my connection for gaming to which im used to <30ms to any UK servers I use, lately this has been flying up to unusable highs of 100ms+ constantly. After changing gateways a number of times it comes back down to normal. When having issues and I try a speedtest its dropped around 2mbit lower than what I would expect it to be, upload bandwidth remains unchanged.

I've been with Plusnet for nearly 2 years now and this is the first type of problem ive had like this, previously these are the sort of issues which cause me to move ISP as its "normally" due to oversubscribed pipes, im not saying this is the case for Plusnet but it has been for my 2 previous ISP's.

Im on the Pro package and have also been regraded to Max Premium. Im synced at 8142/832 which has never dropped from this since having ADSL here, im also plugged into the main (and only) socket in my house, im using a brand new Linksys router with the latest firmware, a new microfilter and do not use any PSTN extensions.

*Unrelated but I seem to be capped at 6.5mbit download despite syncing at 8142 and previously being able to speedtest over 7mbit, is there any Plusnet reason for this?

Kind Regards
Dan

Edited by deleted (Mon 11-Jan-10 17:27:41)

Standard User deleted
(deleted) Mon 11-Jan-10 17:29:37
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
Hi c0dec,

If you PM me (or Bob, Chris or Mand) your PN username we'll be able to take a look at this for you. Sounds like interleaving may have been applied to the line, though we'll know for sure after having a look.
Standard User jelv
(fountain of knowledge) Mon 11-Jan-10 19:15:22
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
Interleaving giving a 70ms increase?

I don't think so!

jelv

Plusnet user since November 2001
Plusnet Community forums: http://community.plus.net
Constructive help from a large knowledgeable group of current Plusnet users


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Mon 11-Jan-10 19:17:35
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
Thanks ive dropped you a pm.

I have the exact problem at the moment and its found something very strange, I can ping the gaming server im connected to from windows under 20ms but when pinging in HLSW or in game I have 90ms+ ? I can only assume this is to do with the port the server is using? I have also disabled my AV and Firewall whilist doing these tests.

Speedtest is coming back fine at 6.6mbit as I would expect it to.

In game net graph:
http://i123.photobucket.com/albums/o292/daniel_green...

Screenshots (note Windows ping vs HLSW Server browser):
http://i123.photobucket.com/albums/o292/daniel_green...

Linksys Status/Settings:
DSL Status: Connected
DSL Modulation Mode: G.dmt
DSL Path Mode: Fast
Downstream Rate: 8128 kbps
Upstream Rate: 832 kbps
Downstream Margin: 8 db
Upstream Margin: 12 db
Downstream Line Attenuation: 29 db
Upstream Line Attenuation: 7.5 db
Downstream Transmit Power: 12 db
Upstream Transmit Power: 5 db
Encapsulation:RFC 2364 PPPoA
Multiplexing: VC
Qos: UBR
Pcr Rate: 0
Scr Rate: 0
Autodetect: Enable
VPI: 0
VCI: 38
Enable: Yes
PVC Status: Up


Firmware Version: 1.01.09
MAC Address: 00:21:29:75:XX:XX
Current Time: 2010-01-11 19:09:28
Login Type RFC 2364 PPPoA
Interface: Up
IP Address: 87.112.XXX.XX
Subnet Mask: 255.255.255.255
Default Gateway: 195.166.128.54
DNS1: 212.159.6.9
DNS2: 212.159.6.10
DNS3:
WINS:


*EDIT*

Just changed gateway to 195.166.128.81 and im now pinging the same server at 12ms through HLSW and in game, surely this cannot be a problem my end.

Dan

Edited by deleted (Mon 11-Jan-10 19:22:45)

Standard User deleted
(deleted) Mon 11-Jan-10 20:54:40
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
Erratic high gaming pings on the Pro package like you are experiencing are the reason I left Plusnet. I got bored of taking ages going through their "test" script and having to escalate faults to get any non robotic response from them when it was very clear the fault was in their traffic management.

Now I am with Zen for several months and the pings are slightly higher but very stable. If gaming is important to you I would look at changing ISP as unless every game / server configuration you play on is listed in their traffic priority list you will get this kind of problem repeatedly even on pro.
Standard User deleted
(deleted) Mon 11-Jan-10 21:24:35
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
Fair enough but ive had it for nearly 2 years now without a single problem frown
Standard User jelv
(fountain of knowledge) Mon 11-Jan-10 21:41:01
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
The gateways are badly out of balance following problems earlier today.

jelv

Plusnet user since November 2001
Plusnet Community forums: http://community.plus.net
Constructive help from a large knowledgeable group of current Plusnet users
Standard User deleted
(deleted) Mon 11-Jan-10 21:43:07
Print Post

Re: High ms on Pro package.


[re: jelv] [link to this post]
 
Yeah I saw from an email earlier, however ive had the same problem for weeks now.
Standard User jelv
(fountain of knowledge) Mon 11-Jan-10 21:48:33
Print Post

Re: High ms on Pro package.


[re: deleted] [link to this post]
 
The network has been frequently out of balance over the last month or so! frown

jelv

Plusnet user since November 2001
Plusnet Community forums: http://community.plus.net
Constructive help from a large knowledgeable group of current Plusnet users
Standard User deleted
(deleted) Mon 11-Jan-10 21:51:25
Print Post

Re: High ms on Pro package.


[re: jelv] [link to this post]
 
I feel this may be the cause then, as it was always fine before frown god damn.
Pages in this thread: 1 | 2 | (show all)   Print Thread

Jump to