Register (or login) on our website and you will not see this ad.
|
|
|
How did you find the FTTC install. Do they just change the faceplate on the master socket or install anymore stuff. There is not much online saying what they do when installing the hardware for FTTC connection
Chris
|
|
|
How did you find the FTTC install. Do they just change the faceplate on the master socket or install anymore stuff. There is not much online saying what they do when installing the hardware for FTTC connection
Chris
There does seem to be a move now to the use of combined modem routers, Plusnet are, I believe, still using the separate modem and router setup which may change in the future. So that may be something to bear in mind when considering fibre.
Ideally one would want to locate the modem as close as possible to the "point of entry", the NTE5, which would mean that if combined modem routers are supplied then the router would be close to the NTE5 also. Separate modems and routers allow the modem to be connected over ethernet to the router located in another part of the premises which may be more convenient than actually moving the NTE5 or using a "data extension" kit, both of which may effectively extend the distance between the modem and the cabinet with the potential for speed reduction.
|
|
|
How did you find the FTTC install. Do they just change the faceplate on the master socket or install anymore stuff. There is not much online saying what they do when installing the hardware for FTTC connection There does seem to be a move now to the use of combined modem routers, Plusnet are, I believe, still using the separate modem and router setup which may change in the future. So that may be something to bear in mind when considering fibre.
The ISPs are clearly gearing up for the launch of 'self-install' FTTC, not least by launching (or preparing to launch) routers with built-in VDSL2 modems. BT Openreach have published the specifications for equipment supplied by the ISPs to their self-install customers and various trials have been run, but I don't believe the product has yet been launched.
Until self-install is launched, the only option is engineer install. The engineer fits an NTE5 if you didn't already have one, then puts an interstitial filter between the back part of the NTE5 and the faceplate. This filter provides a socket for the VDSL2 equipment and filters the DSL signal from all the extensions. If the ISP orders it, a free-of-charge data extension kit is supplied and fitted by the engineer to site the modem up to 30m from the NTE5.
The BT Openreach modem should still be supplied and used, though there are one or two examples in the forums of the engineer using the modem in a combined modem router (the recent example was an installation where a BT Infinity customer had a Home Hub 5).
I'd go for engineer install every time. The engineer should run proper tests using his diagnostic equipment before signing off the job, so any faults should be found before the engineer leaves. Unfortunately, there are some reports of contract engineers cutting corners.
An engineer install should eliminate any issues with the wiring at the served premises. VDSL2 is much more sensitive than any flavour of ADSL to wiring problems.
Ideally one would want to locate the modem as close as possible to the "point of entry", the NTE5, which would mean that if combined modem routers are supplied then the router would be close to the NTE5 also. Separate modems and routers allow the modem to be connected over ethernet to the router located in another part of the premises which may be more convenient than actually moving the NTE5 or using a "data extension" kit, both of which may effectively extend the distance between the modem and the cabinet with the potential for speed reduction. I agree - for optimum performance you should use Ethernet for any data wiring whenever possible.
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
How did you find the FTTC install. Do they just change the faceplate on the master socket or install anymore stuff. There is not much online saying what they do when installing the hardware for FTTC connection
It was a breeze - Openreach engineer phoned from the cabinet, broadband down for a short while, arrived at house, changed faceplate (I kept the old one as it was a Clarity job), plugged in modem, tested it was connected OK, I plugged in the router and it all just worked, even managed to do a speed test before he left. Whole job over in about 30 minutes.
Loads of people have posted their experiences here and in the Fibre forum.
|
|
|
Yes I know a lot of folks who have their routers connected to extensions using only dangle filters (often the router may be some distance away from the NTE5 and there may be additional extensions served from it.)
Indeed an engineer install would be preferable where folks may otherwise consider sticking a modem/router on the end of possibly inappropriate home wiring. ADSL may have been satisfactory when routers were used on extensions with dangle filters but a self install of vdsl using such a setup probably would not, especially if bell wires are still left connected!
|
|
|
I'd go for engineer install every time. The engineer should run proper tests using his diagnostic equipment before signing off the job, so any faults should be found before the engineer leaves. Unfortunately, there are some reports of contract engineers cutting corners.
There have been a number of reports of BT OR engineers not running diagnostic checks on FTTC installs, and most (could be dependant on area) don't even get issued with the diagnostic equipment such as a Exfo orJdsu which is needed to perform these tests, They simply want to do the job and go to the next, the modem obtaining a sync is good enough for some BT engineers,There have been serveral reports of there being a fault, and the engineer telling the customer to contact ISP ,and not repairing the fault
And things such as getting a master socket being moved to a better location don't get done either, customer gets the not part of the instal sorry line ,
So for some there would be little or no benefit from an engineer install, unless they all do the job properly 100% of the time
|
|
|
Did you read the last sentence of that quote Tommy?
I don't think we have seen any reports of Openreach rather than sub-contract engineers doing what you describe.
My broadband basic info/help site - www.robertos.me.uk | Domains,website and mail hosting - Tsohost.
Connection - Plusnet UnLim Fibre (FTTC). Sync ~ 55.8/14.5Mbps @ 600m. - BQM
"Where talent is a dwarf, self-esteem is a giant." - Jean-Antoine Petit-Senn.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Allergy information: This post was manufactured in an environment where nuts are present. It may include traces of understatement, litotes and humour.
Edited by RobertoS (Thu 17-Oct-13 14:58:37)
|
|
|
|
Perhaps as a general rule: only if an end user has good adsl performance from the test socket will vdsl potentially perform adequately? Good adsl performance would at least possibly verify that the line from the NTE5 to the cabinet is OK?
|
|
|
I don't think we have seen any reports of Openreach rather than sub-contract engineers doing what you describe. That's exactly what I was saying. There have been plenty of reports on these forums of contract engineers (Kelly and so on) plugging in a modem, seeing the line has synchronised and rushing for the door. I have not seen any reports of BT Openreach in-house engineers doing this.
|
|
|
And i have seen reports regarding BT openreach engineers cutting corners it's not as uncommon in some areas as you think. Just because it's a BTOR engineer doesn't always mean that they will do the job as they are suposed to do it,
A install can go like this, work done at PCP re jumpering D'side pair ect, then visit customers premiss remove lower faceplate from NTE fit the vdsl filtered faceplate and replace lower faceplate using longer screws, un box BT modem plug into a spare mains power socket connect the DSL RJ11 cable to the filtered faceplate (top) and to modem, wait for it to sync, check the install diag using iphone ,& sign job off, and go to next job, total time at customers premis 10mins , No checks made as to what the sync was ,or for other potential issues and the customer in some cases could end up paying £92 for that,
As for some of the 3rd pary subbies ie kelly coms ect, they can't even manage the above properly
And that's when they actually turn up at the booked time and date
Edited by tommy45 (Thu 17-Oct-13 16:15:02)
|
|
|