In reply to a post by shaneosborne:He said the previous engineer (if you can call him that) got all the wires mixed to all the properties. He is surprised because the job only involves two wires and he had touched approx 8!
What he thinks happened is that he was training someone and the trainer wasn't keeping an eye on his trainee... He then tried covering up the mess which made it worse and said I failed the appointment...
The BTO Engineer is getting fedup going around making right faulty work!!!
He is now moving my faceplate and says I have a good line and exchange.... 40/10
UPDATE::: What a GREAT engineer! Either that or he liked my tea
All sorted, even moved everything for me for easier access!!
Not a great speed but better than what it was :/
Download Speed: 25.9 Mbps
Upload Speed: 5.6 Mbps
All up and running and he said my line is at max although his equipment isn't 100% accurate it could still go up....
I must say my experience with Openreach engineers have almost entirely been like this second one - when I had my fibre installed and the phone wasn't working properly (had to be rejumpered at the exchange) the two guys insisted hanging around for three hours and would not leave until they personally tested it in a working state - even after I said I didn't care and didn't even need a phone line.
The installer guy you got IMO is an exception from the norm and sounds like a total ****-up. That said, he may have been subcontracted/outsourced which explains the poor service, all the actual Openreach engineers I've had have been excellent. Installs however do sometimes get done by lets say, erm... less qualified install techs rather than full engineers.