At present I am on a fully copper ADSL connection with speeds of 10mbs. I am still in contract, but ultimately negotiated a new contract for the lowest tier of full fibre and the contract would start after the FTTP had been installed.
My home is in a poor condition caused by all the tradesmen I have used in the past and have only noticed problems some weeks, months or years after the so called tradesmen have left. I have learnt to live with the conditions.
This being said I am limited in what I will now allow. I will give the Openreach engineer or representative an option of removing two satellite cable wires where there is considerable room to thread their cable, but because fibre cable is inherently fragile he may refuse due to the diagonal angle the wires use to get outside or he may have other reasons.
I want to keep the appointment to at least give the engineer this option or hear what he suggests, but I am not holding out much hope.
PlusNet have already told me under no circumstances can I stay on my old ADSL contract that still has three months to run. If I do not have FTTP they will cut me off and charge a termination fee !
How can they stop my service and at the same time charge a termination fee when I am prepared to stay with them until the end of my contract



Print Thread
