Any details on when to expect 100mbit UK wide release? What upstream options will be? What pricing? Will 50mbit users be automaticallly upgraded to 100mbit? Thanks..
|
|
|
|
All I have heard is that it will be 10mbps upstream.
All I know is this. My street in Sheffield has been cabled for a new broadband provider and other parts of my postcode already get 100/100 so if VM are not doing the same by the time my street goes live ( March 2010) then I will jump ship.
|
|
|
All I have heard is that it will be 10mbps upstream.
All I know is this. My street in Sheffield has been cabled for a new broadband provider and other parts of my postcode already get 100/100 so if VM are not doing the same by the time my street goes live ( March 2010) then I will jump ship.
You may mean 100 Mb.
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
All I have heard is that it will be 10mbps upstream.
All I know is this. My street in Sheffield has been cabled for a new broadband provider and other parts of my postcode already get 100/100 so if VM are not doing the same by the time my street goes live ( March 2010) then I will jump ship.
So let me get this straight.... if VM don't do 100/100 5 months ago, then you are off.
Don't tell me, all those downloads you are doing are plans for a time machine
Edited by deleted (Fri 27-Aug-10 04:03:11)
|
|
|
|
Good to know that cable upstream speeds might finally be getting competitive, however does anyone know how many broadband users at 100Mb the shared coax segment that can link 1000+ properties is capable of supporting?
In other words, are cable customers going to suffer from increasing contention on the coax at busy times of day, with throughput dropping off due to lack of coax bandwidth rather than any problems with backhaul etc? Is the architecture up to the task as Virgin introduces higher bandwidth options?
|
|
|
The capacity of the cable isn't affected by the speed of the download. It's only additional download which will have any impact not the actual speed it comes down at.
Of course the higher speeds may encourage downloading more data - full bluray porn for instance....
If you can't fix it with a hammer you've got an electrical problem.
|
|
|
|
Thanks.
So can a shared coax segment cope with every customer taking 100Mb simultaneously? Obviously worst case example, interested whether there is enough bandwidth available for broadband on the coax to allocate sufficient channels to every user, assuming 1000+ homes connected?
|
|
|
The capacity of the cable isn't affected by the speed of the download. It's only additional download which will have any impact not the actual speed it comes down at.
This doesn't make sense. VMs network is overcontended by design; not inherently a problem so long as you maintain a margin above current usage as not everyone uses their connection fully all the time.
Obviously if you have a large number of heavy downloaders in one area that tends to saturate the network and unless VM increases the network capacity everyone suffers.
[Edit: Re-reading what you said, it's my understanding that the trunk coaxial cables can be saturated as each drop along the distribution line does not have a discrete/exclusive signal range. I would imagine that the fibre backhaul is much more heavily contended than the coax paths and thus will cause problems much sooner.]
Edited by ElBobbo (Sat 28-Aug-10 00:14:47)
|
|
|
100mb will be done next year and no way will 50mb be auto upgraded it will be a totally new tier of service which is rightly so.
Athlon 64 6000+ AM2 X2, ASUS M2N-SLI Deluxe 570 NForce Mainboard, 4GB DDR 2 XMS2 800Mhz Cosair Ram, 3856.46GB Hard Disk Space, 1GB ATI 4670 HD PCI-E 16x Graphics, 700watt PSU.
Ex AOL Dialup 56k Customer....
Ex Freedom2Surf 512k and Ex Eclipse Internet 2mb Customer.
Virgin Media 50mb Cable
Virgin Media R EVIL!!!
http://www.speedtest.net/result/776010289.png
|
|
|
|
Helpful, thanks.
|
|
|
Good to know that cable upstream speeds might finally be getting competitive, however does anyone know how many broadband users at 100Mb the shared coax segment that can link 1000+ properties is capable of supporting?
In other words, are cable customers going to suffer from increasing contention on the coax at busy times of day, with throughput dropping off due to lack of coax bandwidth rather than any problems with backhaul etc? Is the architecture up to the task as Virgin introduces higher bandwidth options?
OK.
A few things here.
Cable bandwidth should be considered in terms of kbps per modem, rather than any absolutes, that's the key figure.
The architecture is fluid, the main way of upgrading an HFC network is node splits, reducing the amount of people sharing a single port / card through the use of existing or new fibre to supply dedicated links back to the hubsite or headend.
The 100Mbit/s and 10:1 upstream ratio involves a standard upgrade cycle of the following:
Splitting a node, then splitting each split, quadrupling the downstream bandwidth per home.
Following the split upgrading the upstream channel width, further doubling the upstream bandwidth per home for a total 8-fold increase.
Noteworthy also is that while there are some areas left which are 1000 homes passed, however it should be noted that most now are 250 - 500 homes passed nodes, uptake of cable broadband will be around the 40 - 50% mark, and of that 400 - 500 modems connected the majority will be at 10Mbit.
Virgin will be supplying either 1 or 2 38Mbit channels which take care of the 10Mbit customers and a further 4 50Mbit channels which look after both the 20 and 50Mbit customers from this node and potentially another 3 nodes, and will do so with no real issues.
This is quite non-trivial to explain without understanding the basics, fundamentally no, the existing architecture isn't up to the task which is why they are upgrading it by pushing fibre deeper and through this reducing the number of homes sharing the coaxial trunks an in turn the fibre.
The 'how many users' question is a piece of string question. The answer is based on such things as:
Usage patterns
QoS in use
Application level management, if any
What level of contention is tolerable, what is the target minimum throughput
etc.
I've seen such huge swings - I've seen 38Mbit/s happily serving 1200+ modems, when the maximum speed available was 2Mbit/s, and likewise seen 38Mbit/s caned by 50 modems - it's impossible to give even a ballpark figure.
if it helps my area runs just fine, perfect speeds 24x7 and there are well over 300 20Mbit and 50Mbit modems connected to the downstream port. There are 4 upstream ports serving the downstreams giving a total bandwidth of 200Mbit/s downstream and 4 x 9Mbit/s upstream, each modem has approximately 0.6Mbit/s of peak time bandwidth which is more than adequate, the port doesn't even reach 50%, or 100Mbit - people's usage is, still, generally quite intermittent or relatively low bandwidth.
Following the upgrade cycle I mentioned above each modem would have 2.4Mbit/s of downstream bandwidth, which would, worst case if every single modem is on 100Mbit which simply isn't going to happen, give a worst case contention of a shade over 40:1. Given the split will be heavily biased towards 20Mbit/s modems the actual ratio is likely to be more like 15:1 - 20:1 - ample under virtually any circumstances.
|
|
|
Thanks.
So can a shared coax segment cope with every customer taking 100Mb simultaneously? Obviously worst case example, interested whether there is enough bandwidth available for broadband on the coax to allocate sufficient channels to every user, assuming 1000+ homes connected?
No residential user network can cope with that, full stop.
Per my above comment also cable upgrades generally aren't allocation of new channels but are reduction of numbers of modems sharing channels.
|
|
|
Any details on when to expect 100mbit UK wide release? What upstream options will be? What pricing? Will 50mbit users be automaticallly upgraded to 100mbit? Thanks..
Middle of next year for UK wide completion, will be a staggered rollout same as the 50 was, starting before the end of this year.
10Mbit will be the upstream.
No idea on pricing.
50Mbit will not be upgraded to 100Mbit, you will, however, get a 1.75Mbit -> 5Mbit upstream upgrade as part of the all tier upstream upgrade to 10:1 ratio.
|
|
|
[Edit: Re-reading what you said, it's my understanding that the trunk coaxial cables can be saturated as each drop along the distribution line does not have a discrete/exclusive signal range. I would imagine that the fibre backhaul is much more heavily contended than the coax paths and thus will cause problems much sooner.]
The fibre back from the cabinets is a simple media conversion from coaxial to optical. For broadband purposes congestion on cable networks should only be considered in the context of CMTS port utilisation.
|
|
|
The fibre back from the cabinets is a simple media conversion from coaxial to optical. For broadband purposes congestion on cable networks should only be considered in the context of CMTS port utilisation.
You're much more likely to reach saturation on the backhaul feeding the CMTS (channels are cheap, backhaul is generally not).
|
|
|
The fibre back from the cabinets is a simple media conversion from coaxial to optical. For broadband purposes congestion on cable networks should only be considered in the context of CMTS port utilisation.
You're much more likely to reach saturation on the backhaul feeding the CMTS (channels are cheap, backhaul is generally not).
On what information do you base this?
Backhaul along one's own fibre network, per Virgin Media and pretty much every other cable company of any size, they do after all own physical networks, is cheap. CMTS cards and node splits potentially involving new fibre pulls to cabinets and new cabinet construction not so much.
Channels are most certainly not cheap, each downstream group needs a corresponding upstream, upstream bandwidth is expensive on cable networks and in areas where the downstream network is busy they're likewise expensive.
If it were as simple as just piling channels in Virgin wouldn't split nodes, it only delays the inevitable. Telewest tried that approach while waiting to be bought by ntl which is why Virgin have had to spend so much money sorting out ex-Telewest areas through belated node splits.
Some ex-Telewest areas, this being one of them, have a maximum of 25MHz of upstream bandwidth available, with about 12.8MHz of that actually usable simultaneously due to network conditions and again due to network conditions this totals out to about 36Mbit/s of upstream bandwidth being available to the area. Noting that DOCSIS upstreams begin to degrade at about 65% utilisation and totally suck by 80% or so you're talking planning around say 25Mbit/s of upstream utilisation, which is split across 4 channels, so you're talking 4 channels of just over 6Mbit/s each which can be used to support downstream traffic. Not a hell of a lot of point in piling 4 x 50Mbit/s bonded groups onto each upstream channel to relieve downstream issues, upstream will soon become an 'issue'.
Removing this restriction on the upstream bandwidth, and where networks are build as such downstream as well, requires new optics and new amplifiers in the field for each and every fibre optic node, trunk, bridge and line that needs the upgrades. Given each amplifier can be serving just a handful of homes and each node likely sub-500 customers it gets kinda expensive kinda quickly.
It's a tad more expensive per home than a new 10GbE PIC on the T640 and a new 10GbE XENPAC on the local switch / GSR, which will serve for the primary path for a large town's hubsite.
|
|
|
On what information do you base this?
Outdated information, it seems.
Thanks for the clarification.
|
|
|
|
|
|
|
On what information do you base this?
Outdated information, it seems.
Thanks for the clarification.
Was never the case, whoever gave you that info was pretty misinformed. Backhaul hasn't been an 'issue' on either network ever really. The exception being the occasional fault with the MetNets.
Peering on the other hand....
|
|
|
Why do you always want more?
Was Eclipse Home Option 1 & VM 2Mb
Now O2 standard
|
|
|
|
detailed info there, surprised you said it all here.
so on overlay a 8 fold increase is happening in the trials, I am sitting here hoping it happens also on commercial rollout which is by no means a defenite at this stage.
legacy as I understand it is much less than a 8 fold increase? surely at the very least all qpsk be bumpede to qam16
|
|
|
Why do you always want more?
And what's wrong with that?
|
|
|
Because Docki moans when he/she doesn't get the full speed all the time.
Was Eclipse Home Option 1 & VM 2Mb
Now O2 standard
|
|
|
detailed info there, surprised you said it all here.
so on overlay a 8 fold increase is happening in the trials, I am sitting here hoping it happens also on commercial rollout which is by no means a defenite at this stage.
legacy as I understand it is much less than a 8 fold increase? surely at the very least all qpsk be bumpede to qam16
Per previous post the physical splits quadruple capacity per home passed, more than enough to deal with the uplift to 10 and 20Mbit.
|