Out for my jog tonight and ran past what looked like a new fibre cabinet.
New cabinet next to the existing one with a 230v sticker on it.
Got back and checked roadworks.org and there was an alert stating:
"HAWKINGE (PCP 4) POWER CONNECTION following street cabinet installation: 5 days notice required to: Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. Approx 2 Metres duct in f/w"
The thing is Hawkinge has an NC marker on the Openreach superfast website.
Does this look like the checker may be falling behind the BDUK initiated work?
Or am I getting my hopes up over nothing?



Print Thread
deleted