My line goes to PCP 5, and according to the BTW line checker the FTTC services should be available from 1st July.
Now there is zero activity around this cab, but the next cab along the main road (number 72) has a shiny new FTTC cabinet next to it, and there was a lot of activity with lots of vans last week and the pavement dug up etc. So this is likely to be live if not now, then shortly.
The two cabs are approximately 287m apart and so I doubt cab 5 can be linked to the same FTTC cabinet due to the amount of cabling that would require crossing 4 road junctions - the road works would be insane.
Should I see works start soon to hit a 1st July date, or can everything be done pretty quickly?



Print Thread
jchamier