The problem runs even deeper than this.
We recently had three new lines installed in our office, all booked at the same time. One committed within an hour, the others within the day.
One accepted for the Monday 1-6 and the other two, Tuesday 8-1pm. We asked to merge the dates, wouldn't have it.
The engineer arrived on the Monday, we asked if he could do the jobs for the Tuesday installs too, but isn't allowed and they are now only assigned a job at a time apparently and do not get another job until the first is complete.
The first engineer did all the prep work for the second install, including the line boxes and tagging the pairs at the cab.
Could have saved so much time but that would be far too simple!
Matt



Pages in this thread:
Print Thread

