My local cabinet is in place now. The side panel was left open and when I took a peak inside, I could see it was where the power is connected, and there were just a few disconnected cables so I didn't see a need to let BT know. A few days later the side door was closed, so I assume they went back to connect power up to it.
On another cabinet near me I have just seen Openreach working. The old and fttc cabinets were both open and the pavement was up, and they had 2 reels of cable (one was black, the other was yellow). Does that give anyone a clue as to the stage they're at? I guess it's fairly obvious it is fully connected now, but I'm not sure about the fibre optic cable from the exchange. Would they do all the other work before the fibre optic cable was in place?
I wish I had the nerve to ask the engineers but I lost it as I approached them.
I have noticed on the latest pdf from Openreach that the last 11 exchanges to become live all had a date of Sept 2012, as does my exchange. To get back to the thread subject though, I noticed that Littlehampton exchange (the next town to me) has been put back to December.