This is why I'm thinking it's more likely they would end up (at least for streets like mine) making the DP the larger manhole at the end of the street, rather than the small ones outside pretty much every other house. There are almost certainly DPs already in situ, where the D side multi pair cable from the PCP cabinet terminates in a joint and is connected to the cables running to the end users. It is, of course, an open question whether Openreach would reconfigure the network if they installed FTTDP.
A small manhole outside each property is more typical of a cable provider than Openreach, but if the site is sufficiently new, it's possible that the same policy as the cable networks has been followed, with a small chamber in the duct work near each property. There won't be a DP in each small chamber.
Edited by deleted (Mon 18-Nov-13 17:09:32)
|
|
|
A small manhole outside each property is more typical of a cable provider than Openreach, but if the site is sufficiently new, it's possible that the same policy as the cable networks has been followed, with a small chamber in the duct work near each property. There won't be a DP in each small chamber. I can confirm these are BT (and hence Openreach) manholes as it has "BT" on the covers, and that there are roughly 2-3 houses per hole. I haven't personally seen what is inside them, but I do know that things had to be done to a few of them due to last year's activation of FTTC. What that work was I am unsure, but a nearby friend asked the Openreach engineers what they were up to outside her house, and the answer had "something to do with superfast fibre". This was before the cab was activated so it wasn't simply customer activation. You'll have to forgive me, there are many things about the actual physical infrastructure I'm most likely clueless on.
For reference, this estate was built in 1983, and all the infrastructure is underground. I would estimate there are just over 100 houses along this street, and there is at least one large BT manhole at one end (which would be, I'm assuming, the intended DP if this technology ever goes commercial). There are also no cable services in my town at all.
|
|
|
Whether g.fast will appear I believe will depend on how sales of FTTPoD pan out....
Low sales will be a gift to the camp that says FTTP is too expensive and decades long payback
|
|
The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
|
|
Register (or login) on our website and you will not see this ad.
|
|
|
Whether g.fast will appear I believe will depend on how sales of FTTPoD pan out....
Low sales will be a gift to the camp that says FTTP is too expensive and decades long payback
yes the old clash of short termism vs long term good for country.
To me it its simple, if the biggest telecom company in the country deems it not enough profit then the gov should takeover and roll it out.
However I dont want BDUK style rollout where the government funds and the private company profits, any such rollout would stay in government ownership until a private company pays the going rate for the assets. Ask how to pay for it? cancel HS2. HS2 going through my countty but no stops, only realistically speeds up travel to leeds and by a small amount, huge waste of cash in comparison to a national rollout of FTTP to promote homeworking.
BT Infinity 2 Since Dec 2012 - BQM
|
|
|
yes the old clash of short termism vs long term good for country.
.
.
.
Ask how to pay for it? cancel HS2.
|
|
|
Ask how to pay for it? cancel HS2. HS2 going through my countty but no stops, only realistically speeds up travel to leeds and by a small amount, huge waste of cash in comparison to a national rollout of FTTP to promote homeworking.
HS2 might be good for the country, but to terminate at a central london station is equally short sighted, when over half the people who might want to get north by train don't live in london - and would have to use the overcrowded existing services to get their first. (So bypassing all trains and driving is still more preferable).
Yes, HS2 should be done after broadband is sorted.
James BT Infinity 2 19/09/2012 - Sold 42/6 - Getting 46/8 - Sync 50 / 9 Mbps @ 470m approx
14 years of broadband (ntl: cable to BT FTTC) - Router: Asus RT-N66U - Modem: Huawei HG612 speedtest
|
|
|
to me HS2 is been behind the curve.
other countries had these sort of trains a decadeor so ago, now its not about travelling to places faster but avoiding the need to travel at all.
Of course I agree on the bad placement of stations as well, the catchment areas that HS2 supposedbly benefits is just the usual, london etc. Apparently putting a stop between derby and nottingham is good for leicester as well, I wish we could somehow forbid the line going through leicestershire in protest. But yeah I guess only london matters.
BT Infinity 2 Since Dec 2012 - BQM
|
|
|
|
I've been hoping for a sliver of common sense for ages now in that the HS2 cash be spent on the broadband infrastructure all over the country.
Alas, politicians.
|
|
|
the catchment areas that HS2 supposedbly benefits is just the usual, london etc.
The politicios don't get it do they. I'm only 35m from central london, and 20 from Heathrow, and I'd bite my arm off instead of getting a train into London and out again for a long trip. On a trip to the north east last year I drove. Obvious when you have to take any more than a small backpack with you. C'est la vie.
James BT Infinity 2 19/09/2012 - Sold 42/6 - Getting 46/8 - Sync 50 / 9 Mbps @ 470m approx
14 years of broadband (ntl: cable to BT FTTC) - Router: Asus RT-N66U - Modem: Huawei HG612 speedtest
Edited by jchamier (Mon 18-Nov-13 21:38:09)
|
|
|
Whether g.fast will appear I believe will depend on how sales of FTTPoD pan out....
Low sales will be a gift to the camp that says FTTP is too expensive and decades long payback
As far as I can tell, and speaking with a couple of people in the know seems to bear this out, the only thing that'll stop deployment of it will be if the trials go very wrong. Cost savings of not having to do that final drop are still non-trivial even with the costs of the DP kit.
|