Standard User Seansmit17
(eat-sleep-adslguide) Thu 13-Feb-14 22:52:21
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
Saw BT outside the TE today.

Wonder when the power to the cabs is going to get connected...

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User RobertoS
(sensei) Thu 13-Feb-14 23:49:37
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
Who knows!? Maybe you'll get a shock.

My broadband basic info/help site - www.robertos.me.uk | Domains,site and mail hosting - Tsohost.
Connection - Plusnet UnLim Fibre (FTTC). Sync ~ 59.4/14.4Mbps @ 600m. - BQM

"Where talent is a dwarf, self-esteem is a giant." - Jean-Antoine Petit-Senn.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Allergy information: This post was manufactured in an environment where nuts are present. It may include traces of understatement, litotes and humour.
Standard User Seansmit17
(eat-sleep-adslguide) Fri 14-Feb-14 12:14:12
Print Post

Re: Is it coming?!


[re: RobertoS] [link to this post]
 
haha, I see what you did there tongue

Is there a way to find out if and when power is going to be connected?

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB

Edited by Seansmit17 (Fri 14-Feb-14 15:41:20)


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Mon 17-Feb-14 14:41:33
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
would of thought you will see a notice on roadworks.org from scottish power if they have to dig a trench to power the cab
Standard User Seansmit17
(eat-sleep-adslguide) Tue 18-Feb-14 15:47:25
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
One would hope.

The cab down next to the pub at the bottom of constitution hill is getting its power connected as I type.

There is also ppl working installing sub ducting from cab 7 to the exchange..

Its getting closer and closer xD

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User RobertoS
(sensei) Tue 18-Feb-14 19:40:47
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
In reply to a post by Jon_Roberts:
would of thought you will see a notice on roadworks.org from scottish power if they have to dig a trench to power the cab
I have a feeling from way back that the roadworks permission would be requested by Openreach, not the subcontractor Scottish Power.

My broadband basic info/help site - www.robertos.me.uk | Domains,site and mail hosting - Tsohost.
Connection - Plusnet UnLim Fibre (FTTC). Sync ~ 59.4/14.4Mbps @ 600m. - BQM

"Where talent is a dwarf, self-esteem is a giant." - Jean-Antoine Petit-Senn.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Allergy information: This post was manufactured in an environment where nuts are present. It may include traces of understatement, litotes and humour.
Standard User Seansmit17
(eat-sleep-adslguide) Tue 18-Feb-14 20:28:30
Print Post

Re: Is it coming?!


[re: RobertoS] [link to this post]
 
I guess it depends?

Check this:



Ffordd Y Llan, Treuddyn, Flintshire
Works Start: 14 Feb 08:00
End: 21 Feb
Medium impact, delays possible
Location : 6
Description : EXCAVATE JOINTBAY IN VERGE
Current status: Work in progress
Traffic lights, etc: None/signing only
Queries should be addressed to Scottish Power quoting reference GY002U11028982
Work info last modified 11:57 on 17/02/2014
Last updated on roadworks.org 20:08 on 18/02/2014
Data source Flintshire County Council

Thats to connect power to a cab near me. Work already done and is listed by SP and not OR

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User deleted
(deleted) Wed 19-Feb-14 17:31:44
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
Hi Sean,

keep an eye out on roadworks.org looks like it will be scottish power providing the notices, glad to see pcp6 getting power soon, ducting gone in today for the fibre

Haydock Close, Leeswood, Flintshire
Works Start: 06 Mar
End: 12 Mar

Low impact, delays unlikely
Location : PCP6 ADJACENT 1 GOODWOOD GROVE
Description : EXCAVATE JOINT BAY IN FOOTWAY
Current status: Planned work about to start
Traffic lights, etc: None/signing only
Queries should be addressed to Scottish Power quoting reference GY002U11081885
Work info last modified 16:47 on 19/02/2014
Last updated on roadworks.org 17:12 on 19/02/2014
Data source Flintshire County Council

Jon
Standard User deleted
(deleted) Wed 19-Feb-14 17:33:15
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
some good news for you too smile

County Road, Leeswood, Flintshire
Works Start: 06 Mar
End: 12 Mar

Low impact, delays unlikely
Location : PCP 7 OPPOSITE 1 THR GARDENS
Description : EXCAVATE JOINT BAY IN FOOTWAY
Current status: Planned work about to start
Traffic lights, etc: None/signing only
Queries should be addressed to Scottish Power quoting reference GY002U11081900
Work info last modified 16:59 on 19/02/2014
Last updated on roadworks.org 17:28 on 19/02/2014
Data source Flintshire County Council

Jon
Standard User Seansmit17
(eat-sleep-adslguide) Wed 19-Feb-14 18:30:58
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
Nice. 3 weeks for power.. looks like end of march for the go live date is still looking good.

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB