Standard User Seansmit17
(eat-sleep-adslguide) Tue 08-Apr-14 22:21:56
Print Post

Re: Is it coming?!


[re: R0NSKI] [link to this post]
 
I cant find anything for cab 3.

I can see my cab in the list:

Address STREET SIDE DSLAM CAB NMCHTN, QUEEN STREET, LEESWOOD, MOLD, CH7 4RQ on Exchange PONTYBODKIN is served by Cabinet 7


TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User R0NSKI
(fountain of knowledge) Tue 08-Apr-14 22:30:04
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
I haven't always been able to find them even for cabinets which are providing fttc, and as Mr Saffron says it may be getting FTTP, or nothing of course.

Standard User dazzle39
(newbie) Wed 09-Apr-14 08:18:18
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
Even with BDUK (SuperfastCymru) it would appear that roll out across an exchange area can take a few months. In Holywell (WNHW) for example, which is a full BDUK area, the first cabinets went live at the end of 2013 but not all areas were done. They seem to keep popping back to install new cabinets every now and then until hopefully the whole area is enabled.


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Wed 09-Apr-14 08:24:07
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
2 is due to start getting FTTC soon . already update about 3
Standard User deleted
(deleted) Wed 09-Apr-14 15:21:58
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
Thanks for the info. I'm glad the other 2 cabs aren't getting left out. I just hope it's not too long a wait till they sort them out.
Standard User Seansmit17
(eat-sleep-adslguide) Wed 09-Apr-14 23:47:14
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
Just seen this pop up on road works.org

What could they be doing at PCP6 Since its live for FTTC? Haven't a clue what's going at at PCP4 either.

Haydock Close, Leeswood, Flintshire
Works Start: 09 Apr
End: 11 Apr
Low impact, delays unlikely
Location : (PCP6) BDUK OPPOSITE SIDE OF 1 LLWYN GOODWOOD CROSSING CARRIAGE WAY TO SIDE OF 1 ON HAYDOCK CLOSE
Description : Install 3m of 1 way poly duct in Footway,Install 5m of 1 way poly duct in Carriageway,Install 9m of 1 way poly duct in Verge,Provide 1 Provide/Recover 1 NGA Cab and base (1.5m x 0.5m)
Current status: Work in progress
Traffic lights, etc: Traffic control (give & take)
Queries should be addressed to BT quoting reference BC005WP00100500130534201
Work info last modified 15:13 on 09/04/2014
Last updated on roadworks.org 17:56 on 09/04/2014
Data source Flintshire County Council


A5104 Corwen Road, Pontblyddyn, Flintshire
Works Start: 09 Apr
End: 11 Apr
Medium impact, delays possible
Location : (PCP4) BDUK SIDE OF OLD POST OFFICE A541 LODGE ENT TO A5104 NORTH JCT ON CORWEN ROAD
Description : To fully reinstate interim site
Current status: Work in progress
Traffic lights, etc: Traffic control (give & take)
Queries should be addressed to BT quoting reference BC005WP00100500130526202
Work info last modified 15:13 on 09/04/2014
Last updated on roadworks.org 17:56 on 09/04/2014
Data source Flintshire County Council


TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User R0NSKI
(fountain of knowledge) Thu 10-Apr-14 06:32:11
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
PCP 6. I've seen this a number of times locally, but a second cab has never been installed. It seems to just be an error.

PCP 4. Perhaps they only laid temporary tarmac or something similar and now going to be done properly.

Standard User Seansmit17
(eat-sleep-adslguide) Thu 10-Apr-14 16:02:45
Print Post

Re: Is it coming?!


[re: R0NSKI] [link to this post]
 
PCP2 is getting its FTTC Twin installed at the end of the month. Good news for those connected to it smile

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB
Standard User deleted
(deleted) Thu 10-Apr-14 23:53:47
Print Post

Re: Is it coming?!


[re: Seansmit17] [link to this post]
 
strange to see that with pcp6, however its not on there anymore (roadwork.org)

will be going live day tuesday, as long as the engineer turns up! smile
Standard User Seansmit17
(eat-sleep-adslguide) Fri 11-Apr-14 01:11:22
Print Post

Re: Is it coming?!


[re: deleted] [link to this post]
 
Another 2 weeks for me frown

TalkTalk 24Mb
Current Line Status

Connection Speed 24272 Kbps 1019 Kbps
Line Attenuation 14.5 dB 5.5 dB
Noise Margin 0.3 dB 11.8 dB