4.5 months on and my Cabinet LNILC 66 has been in the 'Build' stage for a while with no evidence of any actual infrastructure work. Code Look says the FTTC live date is December 2017 (Fantasy as far as I can tell). Paul can you check your sources for an up to date estimate? Did your cabinet get FTTC?
As far as I can see loads are being done over the next 4 to 6 months, some should be done between the next few weeks and within the first quarter of next year.
As for what cabinets they are I cannot tell you.
Sadly I have lost most of my sources that I use to abuse LOL, but I will try and take a look.
As for my Cabinet 24, yeah it went live not long ago with FTTC, I am now glad I kept pestering the people high up in BT to get my FTTP.
*** Update ***
Found this for cabinet 66.
Date: 27 Nov - 8 Dec
Location: Blackthorn Road, Ilford, Redbridge
Description: Install 4m of 2 poly ducts in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500245072600
Date: 27 Nov - 8 Dec
Location: Loxford Lane, Ilford, Redbridge
Description: Install 4m of 2 poly ducts in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500245072601
Some homes on cabinet 48 have FTTP and the rest are due to get FTTC.
Date: 7 Dec - 20 Dec
Location: Lavender Place, Ilford, Redbridge
Description: Install 25m of 1 way poly duct in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500251798300
Date: 7 Dec - 20 Dec
Location: Uphall Road, Ilford, Redbridge
Description: Install 5m of 1 way poly duct in Footway.
Work Ref: BC006CT001LC500251798301
Cabinet 13:
Date: 30 Nov - 13 Dec
Location: Connaught Road, Ilford, Redbridge
Description: Install 8m of 2 poly ducts in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500243809000
Cabinet 28:
Date: 4 Dec - 15 Dec
Location: Dore Avenue, Manor Park, London, Newham
Description: Install 6m of 2 poly ducts in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500245062301
Date: 4 Dec - 15 Dec
Location: Gainsborough Avenue, Manor Park, London, Newham
Description: Install 3m of 2 poly ducts in Footway,
Description: Install 8m of 2 poly ducts in Carriageway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base,
Description: Install 1m of 1 way power duct in Footway,
Description: Performing an 1excavation to expose existing power cable in Footway.
Work Ref: BC006CT001LC500245062303
Cabinet 23
Date: 16 Nov - 29 Nov
Location: B165 Church Road, Manor Park, London, Newham
Description: Install 5m of 2 poly ducts in Footway.
Work Ref: BC006CT001LC500243880204
Date: 16 Nov - 29 Nov
Location: Gainsborough Avenue, Manor Park, London, Newham
Description: Install 15m of 2 poly ducts in Footway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500243880205
Cabinet 46
Date: 20 Nov - 1 Dec
Location: A117 Forest Drive, Manor Park, London, Newham
Description: Install 1m of 2 poly ducts in Verge,
Description: Install 20m of 2 poly ducts in Footway,
Description: Install 8m of 2 poly ducts in Carriageway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500245057201
Date: 20 Nov - 1 Dec
Location: Capel Road, Manor Park, London, Newham
Description: Install 1m of 2 poly ducts in Verge,
Description: Install 20m of 2 poly ducts in Footway,
Description: Install 8m of 2 poly ducts in Carriageway,
Description: Provide, Renew or Recover 1 DSLAM street cabinet and base.
Work Ref: BC006CT001LC500245057202
Cabinet 1 (I Think)
Date: 1 Dec - 7 Dec
Location: Oakfield Road, Ilford, Redbridge
Description: DSLAM STREET CABINET & POWER INSTALLATION plus PCP RESHELL.
Description: Excavate to lay BT ducts, Lay concrete plinth, Stand cab.
Description: Excavate to expose low voltage cable for Power Connection and lay duct.
Description: POWER engineer to carry out inspection prior to jointing.
Description: POWER jointing team to insert cable and execute jointing works.
Description: Reinstate, Check and clear site. Maximum excavation depth 700mm.
Work Ref: BC006KNLEPSEILFRDCNTRL11
Cabinet 2 is live with FTTC
This is about all I could find when doing a quick search.
Hope it helps.
Paul
Edited by PaulKirby (Sat 25-Nov-17 23:51:20)