My line was hit by DLM twice this year so far. The first time (Multiple power interruptions caused by faulty UPS) it took around 16 days to restore my connection to its previous 79999/19999.
The second time (No discernible cause) it took around 20/21 days. My connection came back to 79988/19999. Not too bad but I have seen the effect of increased crosstalk due to other lines in the cab being enabled. (Roll on vectoring). I have lost around 23Mbps of attainable rate on the downstream during the last two years.
BT -> Zen -> F2S -> Bulldog -> Be* -> BT Infinity 2 -> Plusnet Unlimited Fibre Extra
Say it with flowers, give her a Triffid