I have an update on this. I received an email which states this:
--Start
The postings on the link were very good and pretty much set out how things are.
One of the main problems we face is that the data we are given is detailed by postcode, but telecoms infrastructure clearly does not follow postcodes. In fact, as the surveys progress we are finding that we have some postcodes that are served by a number of cabinets, and some cabinets that serve properties in more than one postcode. When you factor in the fact that some properties may be served by exchanges or cabinets that are several miles away you can see the difficulties.
The reason for this state of affairs is that when the original copper telecoms systems were developed it was often the big houses that had telephones first, and these were connected back to an exchange (which would have been manned by real people!) As more properties were built, cabinets were introduced at strategic points to enable better management of the network, and over recent years as more developments have been built so more cabinets have been installed. At the most extreme end of things we have a property in Stratford that is connected to the Rugby exchange, and in many cases two neighbouring properties may be served by different cabinets, with one of them being a considerable distance away.
All of this makes it very hard to be sure what the real position is in a given area, and almost impossible speeds any property is likely to achieve until the cabinet is upgraded. In your case, you would appear from our maps to fall between a grey area and a white area.
Under EU rules, known as State Aid, We are not be able to spend money in any area that is marked as grey. Therefore, we are trying to ensure that these are defined as tightly as possible. If there is even one property within a postcode that will not achieve superfast speeds then it has been classified as white for the purpose of the consultation.
Consider a postcode where 89 out of 100 homes or businesses have been connected to the NGA network, on the latest map this would be shown as No provider because there are still 11 homes or businesses to be connected.
By mapping partial postcodes as white we retain the option to invest in these areas if intervention is required to ensure the availability of superfast broadband.
We are currently tendering for a partner to extend the rollout using the second block of funding. The Government has announced additional funds of £3.68m to take superfast broadband coverage up to 95% (our current project will achieve 91%), and Warwickshire County Council has approved this match funding for this to cover Warwickshire. We have also been offered an additional £6m from BDUK and have recently made a submission through the Coventry and Warwickshire Local Enterprise Partnership European Structural Investment Funds Strategy for a total of £7.85m to use as match funding, and project partners are also contributing to the mix Additionally, we continue to actively seek additional funds to enable us to take the fibre network as far as possible.
CSW Broadband will be procuring a partner to take the network forward, but are a long way from being able to say which areas will benefit. We will therefore not know which areas will be covered by the additional funding until the procurement is complete and modelling work has been carried out, which will be around spring next year. The additional funding will have to be spent by 2017, so the rollout will take place at the same time as the existing project.
The team is still actively working towards the EU 2020 targets of 100% coverage at a minimum of 30Mbps � which is higher than the current superfast speed of 24Mbps and so will be quite a challenge!!
Hope this helps in terms of what�s happening, even if it�s not really the answer you were hoping for.
--End
Thanks to all who posted, I have found all this information very interesting. Now it is just a case of me being patient, even though it is driving me mad! Uploading Photoshop files for clients to view reminds me of early 2000 problems - sigh.... More coffee is needed... Just a thought, I can deliver my designs to clients by car - would be much quicker. Yes I have gone mad. Thanks