[re: deleted] [link to this post]
 
No need to talk to them

http://www.cswbroadband.org.uk/where-when/rolling-12... gives their 12 month plan and the cabinets affected. Not just rural, but any area that meets the project criteria.

Work for Warwick area is planned for Jan 2015 and later. Though suspect your cabinet is not included due to looking like it serves a small area and thus represents poor value for money. A case of now waiting to see how far the public money that there is to spend will spread. It might be 2015, it might be 2017 or even 2018

Edited by MrSaffron (Thu 02-Oct-14 11:14:29)

The author of the above post is a thinkbroadband staff member. It may not constitute an official statement on behalf of thinkbroadband.
Standard User deleted
(deleted) Thu 02-Oct-14 11:37:51
Print Post

Re: Fibre cable laid but how long...


[re: MrSaffron] [link to this post]
 
In reply to a post by MrSaffron:
No need to talk to them

http://www.cswbroadband.org.uk/where-when/rolling-12... gives their 12 month plan and the cabinets affected. Not just rural, but any area that meets the project criteria.

Work for Warwick area is planned for Jan 2015 and later. Though suspect your cabinet is not included due to looking like it serves a small area and thus represents poor value for money. A case of now waiting to see how far the public money that there is to spend will spread. It might be 2015, it might be 2017 or even 2018


Thanks for this! Yes will give them a shout. Many thanks to all who contributed! Have a great day smile
Standard User deleted
(deleted) Thu 02-Oct-14 12:20:12
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
In reply to a post by benedwards:
Yes I have spoken to them quite a few times and my area is not covered by them. I believe they are helping rural areas, my area according to their map is not going to covered by CWS Broadband. Thank you anyway smile


There appears to be 7 postcodes served by cab 56. However, every single one of these postcodes have 50% or more of their properties served by cab 49 or, in one case, cab 57.

The map produced by CSW appears to show your area as covered, because the area covered by cab 49 overlaps with that for 56 ... and cab 49 was done commercially back in 2010. There is also a tiny overlap with cab 57, which was upgraded in 2013.

CSW know that this kind of overlap can happen, as they are one of the projects that explains things well in their FAQ; I'd have expected them to be able to tell you individually of this problem, and what they expect to happen to your cab.

Unfortunately, MrS is right - the cabinet looks rather small, and unlikely to be high on the list for upgrade.

It might be worth going back to CSW, and pointing out that while their map shows the area is commercially covered, it isn't completely true: cab 56 has been left out of the commercial coverage.


Register (or login) on our website and you will not see this ad.

Standard User deleted
(deleted) Thu 02-Oct-14 12:31:13
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
In reply to a post by WWWombat:
In reply to a post by benedwards:
Yes I have spoken to them quite a few times and my area is not covered by them. I believe they are helping rural areas, my area according to their map is not going to covered by CWS Broadband. Thank you anyway smile


There appears to be 7 postcodes served by cab 56. However, every single one of these postcodes have 50% or more of their properties served by cab 49 or, in one case, cab 57.

The map produced by CSW appears to show your area as covered, because the area covered by cab 49 overlaps with that for 56 ... and cab 49 was done commercially back in 2010. There is also a tiny overlap with cab 57, which was upgraded in 2013.

CSW know that this kind of overlap can happen, as they are one of the projects that explains things well in their FAQ; I'd have expected them to be able to tell you individually of this problem, and what they expect to happen to your cab.

Unfortunately, MrS is right - the cabinet looks rather small, and unlikely to be high on the list for upgrade.

It might be worth going back to CSW, and pointing out that while their map shows the area is commercially covered, it isn't completely true: cab 56 has been left out of the commercial coverage.


Hi WWWombat,

Thank you so much for this info. I will email them armed with this info and see what they write back. Once I have something I will post here.

Many thanks again,

Ben.
Standard User deleted
(deleted) Thu 02-Oct-14 13:06:35
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
Take a look at
http://www.cswbroadband.org.uk/whats-happening/lates...
dated Tuesday.

It shows that they've been re-evaluating all the covered postcodes ready for phase 2: This time, postcodes get turned white when they haven't been covered 100%, so those postcodes covered by 56 ought to now be white.
Standard User deleted
(deleted) Thu 02-Oct-14 14:10:38
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
Hi WWWombat,

Thank you again for your posts.

I had a look at this on Tuesday morning but need to re-read it now armed with the knowledge you have provided.

Many thanks again for all of your efforts!

Cheers,

Ben.
Standard User deleted
(deleted) Thu 02-Oct-14 15:49:46
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
Hi again!

I had have a look at the map and for my area it says:

NGA Grey - One Provider

Do you know what State Aid Classification means?

Thanks smile
Standard User deleted
(deleted) Thu 02-Oct-14 17:04:37
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
It means that the area is already covered by one NGA supplier, or is included in their plans over the next couple of years. If it were black, it would be two or more suppliers.

It also means that CWS is not allowed to spend money on the area, as NGA broadband is already supplied. They are only allowed to provide state aid for white areas with zero suppliers.

Unfortunately, what it really means is this ... that CWS has been *told* the area is covered by the supplier, and has no contradictory evidence.

Judging from the latest news, CWS has been going through an OMR for phase 2 - an open market review, where all suppliers tell them where they supply service, and what their plans are. This OMR is followed by a public consultation where the public - you - get to tell CWS where the suppliers are wrong.

In your case, BT are likely to have told them about cab's 49 coverage, but perhaps didn't report that the coverage isn't 100%.

This is your chance to report to CWS the fact that they are wrong. If you don't do it, then CWS will not be able to fund an upgrade.

The only way to be sure is to report to CWS that their map is wrong; you have no NGA coverage, and report those cabinet details.
Standard User deleted
(deleted) Thu 02-Oct-14 17:19:54
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
In reply to a post by WWWombat:
It means that the area is already covered by one NGA supplier, or is included in their plans over the next couple of years. If it were black, it would be two or more suppliers.

It also means that CWS is not allowed to spend money on the area, as NGA broadband is already supplied. They are only allowed to provide state aid for white areas with zero suppliers.

Unfortunately, what it really means is this ... that CWS has been *told* the area is covered by the supplier, and has no contradictory evidence.

Judging from the latest news, CWS has been going through an OMR for phase 2 - an open market review, where all suppliers tell them where they supply service, and what their plans are. This OMR is followed by a public consultation where the public - you - get to tell CWS where the suppliers are wrong.

In your case, BT are likely to have told them about cab's 49 coverage, but perhaps didn't report that the coverage isn't 100%.

This is your chance to report to CWS the fact that they are wrong. If you don't do it, then CWS will not be able to fund an upgrade.

The only way to be sure is to report to CWS that their map is wrong; you have no NGA coverage, and report those cabinet details.


Wow,

Thank you again for all of your help. I have lived here to two months now and have prior to this I had been search the web for answers. I had called my ISP and tried to call Openreach too to get answers but you have nailed it. I will draft an email to CWS and let them know.

Again thank you so much for the help, I might just get somewhere with this!

Kinds regards,

Ben.
Standard User deleted
(deleted) Tue 21-Oct-14 07:33:54
Print Post

Re: Fibre cable laid but how long...


[re: deleted] [link to this post]
 
Hi folks,

I have an update on this. I received an email which states this:

--Start

The postings on the link were very good and pretty much set out how things are.

One of the main problems we face is that the data we are given is detailed by postcode, but telecoms infrastructure clearly does not follow postcodes. In fact, as the surveys progress we are finding that we have some postcodes that are served by a number of cabinets, and some cabinets that serve properties in more than one postcode. When you factor in the fact that some properties may be served by exchanges or cabinets that are several miles away you can see the difficulties.


The reason for this state of affairs is that when the original copper telecoms systems were developed it was often the big houses that had telephones first, and these were connected back to an exchange (which would have been manned by real people!) As more properties were built, cabinets were introduced at strategic points to enable better management of the network, and over recent years as more developments have been built so more cabinets have been installed. At the most extreme end of things we have a property in Stratford that is connected to the Rugby exchange, and in many cases two neighbouring properties may be served by different cabinets, with one of them being a considerable distance away.


All of this makes it very hard to be sure what the real position is in a given area, and almost impossible speeds any property is likely to achieve until the cabinet is upgraded. In your case, you would appear from our maps to fall between a grey area and a white area.


Under EU rules, known as State Aid, We are not be able to spend money in any area that is marked as grey. Therefore, we are trying to ensure that these are defined as tightly as possible. If there is even one property within a postcode that will not achieve superfast speeds then it has been classified as white for the purpose of the consultation.



Consider a postcode where 89 out of 100 homes or businesses have been connected to the NGA network, on the latest map this would be shown as No provider because there are still 11 homes or businesses to be connected.



By mapping partial postcodes as white we retain the option to invest in these areas if intervention is required to ensure the availability of superfast broadband.



We are currently tendering for a partner to extend the rollout using the second block of funding. The Government has announced additional funds of £3.68m to take superfast broadband coverage up to 95% (our current project will achieve 91%), and Warwickshire County Council has approved this match funding for this to cover Warwickshire. We have also been offered an additional £6m from BDUK and have recently made a submission through the Coventry and Warwickshire Local Enterprise Partnership European Structural Investment Funds Strategy for a total of £7.85m to use as match funding, and project partners are also contributing to the mix Additionally, we continue to actively seek additional funds to enable us to take the fibre network as far as possible.



CSW Broadband will be procuring a partner to take the network forward, but are a long way from being able to say which areas will benefit. We will therefore not know which areas will be covered by the additional funding until the procurement is complete and modelling work has been carried out, which will be around spring next year. The additional funding will have to be spent by 2017, so the rollout will take place at the same time as the existing project.



The team is still actively working towards the EU 2020 targets of 100% coverage at a minimum of 30Mbps � which is higher than the current superfast speed of 24Mbps and so will be quite a challenge!!



Hope this helps in terms of what�s happening, even if it�s not really the answer you were hoping for.


--End


Thanks to all who posted, I have found all this information very interesting. Now it is just a case of me being patient, even though it is driving me mad! Uploading Photoshop files for clients to view reminds me of early 2000 problems - sigh.... More coffee is needed... Just a thought, I can deliver my designs to clients by car - would be much quicker. Yes I have gone mad. Thanks smile