http://imgur.com/AuHAG5d
also in the link above it shows there is work on the main road to malton they are digging up in the verge and same across the road i was wondering if they are getting power ready for cabinet 1 and going to install a dslam furthur up the road



Pages in this thread:
Print Thread
