So far so good, work in the exchange area looks like it is gaining pace. Cabinet 4 DSLAM has been stood, although no telling when this will be enabled, since there's no noise from it yet.
Roadwork plans are showing up for July near the cab locations for 1 and 5, there's a chance they're passing on their initial FTTP plans, although I can't be sure since it doesn't mention DSLAM or NGA cabinet yet.
For #1:
Build 1 concrete chamber 1690mm x 710mm x 1565mm deep in Footway,Install 3m of 2 poly ducts in Footway,Install 3m of 2 poly ducts in Verge,Install 7m of 2 poly ducts in Carriageway.
But if they were to go for FTTC now on cab 5, then Castlemorris and a few other spots aren't likely to get superfast speeds, because they are too far away from that cabinet. Similar issue with cab 1, only a portion of the area might be able to get superfast speeds at all. The Welsh Gov states they intend to get superfast to as many properties as possible even after Superfast Cymru, so hopefully those white postcodes won't be overlooked.
|