BT experts please help me on whats going on so I can get a better understanding. I can maybe do fibre checks for people, but I really don't understand the technical side of things! LOL
Am I correct in thinking the large distribution pole behind obstructing the view of the "National Speed Limit" sign, is for Electricity, leading on to the one further back?
As the premade plinth was in place standing cab on day 1 makes perfect sense, its just a lift off the crane and secure to base job. The fiddling bits are the duct to old PCP and wiring in the copper link and getting the power up running and signed off.