"Cabinet 7 in the Tenbury Wells exchange area is planned to be upgraded by Connecting Shropshire with Fibre to the Premises (FTTP), which gives access to download/upload speeds of up to 300/30mbps.
We�re expecting the build to be complete by this time next year. Thereafter, it takes around 8 weeks to commission, longer than for Fibre to the Cabinet (FTTC) as we�re taking fibre to many distribution points, not just to one place (the cabinet).
Realistically, it�s looking like the end of 2016 before fibre broadband will be available in the area. Please also be aware that, at this stage, we cannot be 100% certain that all the premises served by cabinet 7 will have access to fibre broadband."
I was just wondering the max length for a fttp install from pole to house, im about 140m from the nearest manifold, will this be too long for a fiber cable to the house?