Standard User cobra7512
(regular) Mon 05-Mar-18 16:10:44
Print Post

Re: FTTP availability


[re: deleted] [link to this post]
 
Hi Andy, that post was back in DEC. We have our fttp installed after 5 cancelled appointment.
Standard User ian72
(eat-sleep-adslguide) Mon 05-Mar-18 16:12:01
Print Post

Re: FTTP availability


[re: deleted] [link to this post]
 
It is one of those fun simple typos that results in the opposite meaning but given the rest of the sentence I suspected it was a typo wink
Standard User Zarjaz
(eat-sleep-adslguide) Mon 05-Mar-18 16:14:29
Print Post

Re: FTTP availability


[re: ian72] [link to this post]
 
.... and the time warp thing, does it explain that ?


Register (or login) on our website and you will not see this ad.

Standard User ian72
(eat-sleep-adslguide) Mon 05-Mar-18 16:16:59
Print Post

Re: FTTP availability


[re: Zarjaz] [link to this post]
 
Technically it would appear the post was correct. Pretty quick from OpenReach to be honest to inform someone as quickly as 3 months.
Standard User deleted
(deleted) Mon 05-Mar-18 21:31:37
Print Post

Re: FTTP availability


[re: cobra7512] [link to this post]
 
In reply to a post by cobra7512:
Hi Andy, that post was back in DEC. We have our fttp installed after 5 cancelled appointment.


We are (well, my neighbours who signed up with BT) having the same thing. First booked for an �upgrade� from ADSL to fibre (FTTP) and got an appointment date. Then got cancelled the day later, because of a survey. (This only happened in the last three days). So waiting for survey.

Could you share when did you �finally� got connected? And did you have to �order� again etc?
Standard User cobra7512
(regular) Tue 06-Mar-18 16:38:24
Print Post

Re: FTTP availability


[re: deleted] [link to this post]
 
The engineer who install the ONT told us the delay has nothing to do with survey. The only reason is there are only 3 engineers who are trained to do the indoor installation in our area (south Warwickshire). We get about £150 compensation from BT because of the lost of service during Christmas and New year and those 5 cancelled appointment.