My official update this week is that the cabling team are on the ground and once complete will be passed to jointers.
The unofficial update from talking to engineers o the ground is that all ducts have been roped apart from a couple at the top where they hope to 'overblow'. I believe this is close to the exchange. I'm really pleased to have got the country lane ducts roped as these were the ones I was concerned about being blocked as may not have been accessed for years.
I did ask with a cheeky grin if I might have it by the time Santa arrives, this was met with a look to senior installer, and an 'ooof' so probably not but it might be. So I suspect not. Was away later part of week so haven't seen if the fibre is in the ground or just the ropes, but they have been trolling round with a trailer with fibre drum on it. Will have a look at the weekend.
From digging through posts I need the following:
Cabling Team
Jointing Team
Whoever installs the CBT/DP thing in the ground box outside
Whoever connects the far end
1-visit to install from ground box through 150m of duct to inside box (on the hope that I get a 1-visit install).