Is it a new install or do you already have the hardware (i.e. ONT etc) installed?
Going by the activation date I assume this is a complete new install of FTTP.
So I assume they will do all the external work before then and then on that date (4th June) they will do the internal part of the install (assuming they are allowed to do so) and if all goes well should be live then
Paul
BTBroadband - Full Fibre 900 Halo 1 + FVA
Exchange Name: Ilford Central (LNILC) Cabinet: 24
TBB Speedtest IPv4 | TBB Speedtest IPv6 | Ookla Speedtest (Multi-Threaded) | MikroTik Tik RB4011iGS+RM (BQM)
Exchange Name: Ilford Central (LNILC) Cabinet: 24
TBB Speedtest IPv4 | TBB Speedtest IPv6 | Ookla Speedtest (Multi-Threaded) | MikroTik Tik RB4011iGS+RM (BQM)



Pages in this thread:
Print Thread
