I just spoke to a neighbour who spoke to the electrical engineers who are working, they told them that they were re-doing the electricity cables and poles because someone wanted to charge their car battery. This makes less sense to me than it being a 5G mast.
I guess that’s a possibility if the requestor needs an upgraded grid connection. I’ve done two now; a single to three phase, from 60A single to 100A per phase three phase and another from 100A single to 200A per phase three phase.
DNO and Tx split upgrade prices make OR FTTP oD pricing seem like a warm up act.