Re: 16 Day Setup Window with TTB?


[re: candlerb] [link to this post]
 
AIUI, when FTTP is installed by builders on new build houses they never connect the internals to the externals. The duct from the street chamber contains only a pull cord for OR or the contractor to draw the fibre through, with that ducting ending a few cms up the outside wall.

I expect your setup is similar, maybe with the ducting ending in the comms room.

I thought that on builder completion they would notify OR, to complete the installation. That step missed perhaps?

Connections: OnePlus 8 Pro, 4G max 165Mbps down, 24Mbps up on Three Mobile, and B311 4G router, tbb tests normally 35-45Mpbs down, 65Mbps off-peak, 9-24 up.
Standard User deleted
(deleted) Fri 02-Jul-21 16:02:32
Print Post

Re: 16 Day Setup Window with TTB?


[re: Pheasant] [link to this post]
 
In reply to a post by Pheasant:
The summary is "red means dead" - either no light (or not enough) at the ONT. Call service provider to resolve.
Good advice, maybe it should be added to the official documentation smile