Agreed, that's a joke. There are prescribed zones for a reason. All those cables require protecting with an appropriate containment system before the plasterboard is installed.
Bit late for that, those pictures were taken about 5 years ago. I wasn't aware of the zones, but there's no way I'd have run the network cable over mains like that. As it'd have been instant dismissal at one of my previous roles, and old habits die hard. As the lack of circuit segregation would impact the insurance underwriting. But what you can expect from bods that didn't even appear to have four quids worth of crone tool to properly terminate the network connections.



Pages in this thread:
Print Thread
